Haygood & Associates Landscape Architects – award-winning landscape architects serving California since 1977 Haygood & Associates Landscape Architects – award-winning landscape architects serving California since 1977
 
 

AWARD-WINNING LANDSCAPE ARCHITECTS

HOME line SERVICES line FEATURED PROJECTS line ABOUT US line CONTACT US
 
 

Award-winning landscape architects serving California since 1977

Featured Projects

Share:  

line

Browse Projects:

Fremont Grade Separations:

- Washingtonarrow right

- Paseo Padrearrow right

Route 238 Corridorarrow right

Lewelling Blvd Streetscapearrow right

I-680 Auxiliary Lanesarrow right

US101, Cotati Soundwallsarrow right

US101/Broadway Interchangearrow right

US101 HOV and Auxiliary Lanesarrow right

Fairfield Gateway: Travis Blvdarrow right

Warm Springs Extension BARTarrow right

BART Castro Valley Stationarrow right

line

Artist's rendering for the Bay Area Rapid Transit (BART) Warm Springs Extension Project, City of Fremont, California. HNTB, Architect of Record.

Artist's rendering for the Bay Area Rapid Transit (BART) Warm Springs Extension Project, City of Fremont, California. HNTB, Architect of Record.

Photo of the BART Warm Springs Extension Project under construction in 2015. Haygood & Associates designed the landscape and hardscape features.

Photo of the BART Warm Springs Extension Project under construction in 2015. Haygood & Associates designed the landscape and hardscape features.

Warm Springs Extension BART

City of Fremont, California

The $890M Warm Springs Extension of BART added 5.4 miles of track and a passenger station from an existing station in central Fremont south of Walnut Avenue, to a new station in the city's Warm Springs District to the south.

As a consultant to Parsons Brinckerhoff, Inc., Haygood & Associates designed the landscape and hardscape features for the Warm Spring Station including the vehicular and pedestrian plazas, frontage and entrance roads, 2,000-car parking lot and perimeter site areas as well as areas within Central Park that were disturbed by the subway construction. Areas around a ventilation structure within the park, modifications to the existing Fremont Station and restoration of areas around the tail track to the south were landscaped.

During the design build contract, Haygood & Associates was the landscape architect for the Parsons Brinckerhoff GEC oversight team for BART reviewing the work of the design/build team. Shimmick/Skanska Joint Venture constructed the north Subway segment of the project and the Warm Springs Constructors Design Build Team Kiewit/Mass A Joint Venture designed and constructed the Line, Track, Station and Systems contract to the south. end of article

 
   
 

HAYGOOD & ASSOCIATES LANDSCAPE ARCHITECTS

Copyright © 2023 Haygood & Associates Landscape Architects. All Rights Reserved.

Website design by POITRA Visual

HOME  |  SERVICES  |  FEATURED PROJECTS  |  ABOUT US  |  CONTACT US  |  510.527.6343  |  BERKELEY, CALIFORNIA

 
 

Share: